Home
Live Timing Stats & Points
HMMRC Event Calendar 2024
About Flat Track Circuit
Circuit Rules 2024
Circuit Gallery
About Drag
Drag Championship Points
H.M.M.R.C. Drag Racing Records
Rules: General Drag Car
Rules FED, BB, KT,N P/S
Drag Gallery
History
Constitution
Track Build Progress
Contact us
Contact Us
Committee Members Contact List
Links
News
Facebook
Latest progress on the New Track build
Original Track
Tuesday Night Dismantling
It started Monday night, just the wiring, next minute.
get a phone call on Tuesday night and well as you see a little working bee. Dave and his Boys came up and Hans and Dion, got a little busy.
Part of the dismantled Track
It was only going to be a little bit.
Wednesday Night
Cleaning up the Track from the Club.
Finishing off dismantling the Track
Rob J, Jan P,Hans and Dion clearing out the remainder of the track. Doug M just missed in the photo busy cleaning up all the wiring.
Kieran D, Rob J, Jan clearing out track.
Track that was used for the Easter Show back in the Hay days
Steve and Dion pulled the old Track that was used for shows out from the Roof, a bit to gone to refurbish.
Finally managed to have a Break
Rob D, Kieran D, Maurice and Doug H having a break from all the lifting and work that was done on Wednesday night.
Thursday Day 3 of clean up
The club all cleaned up and ready for the New Track, 1.2tonnes Later.
Spotless Floor
Well all that's left to do now is start the New track keep watching.
First Stages of the Trestles
Hans has cut out all the 4 x 2 for the Trestles, he's drilling holes for the long bolts to hold the Trestles upright.
Sunday 16th December
Hans doing more work on the Trestles
Making the Jigs
Rob and Dion drilling the holes in the Jig for precision cutting of the Track
Making of the Jig
Dion Drilling holes in the jig
First Corners
Doug and Rob cutting out the first corners of the Track
Sunday 16th December
Doug, Rob and Dion working on the first corners.
Low dust volumes
Dion helping in keeping the dust low, while Rob Routers.
20th December
Franz and Hans sorting the Trestles while Doug and rob sorting out a shorter jig out for track cutting out.
20th December
Franz making Trestles
Rob setting up first jig reading for marking out
Doug Marking out the first S bend corners.
1
2
3
4
5
Next »